MR FRAMPTON

YOUR PERSONALISED UPDATES PAGE

Dear Mr Frampton

Thankyou for choosing A.M. Restorations (UK) Ltd to carry out the restoration of your Triumph Stag and welcome to your personalised update page.

Over the course of the restoration you can follow progress by visiting this personalised page at any time. Updates are normally posted each Saturday.

You are of course welcome to contact the workshop or make a personal visit at any time to discuss any of the work that is taking place.

Welding

Both front window pillars, scuttle and inner door areas have had the rust removed, repaired and filled. The boot lid has also had the same treatment. Welding and filler is also being done to the drivers side rear quarter panel, due to the nature of filling there won’t be any photos until it’s completed.

Welding

This session of work sees repairs carried out around the rear of the tail lamp area, suspension area, and also we replace the boot floor with a new panel. New exhaust hangers are also welded on.

Welding

This week sees us align and weld on the near side rear panel and inner arch.

Welding

This week sees the off side rear quarter panel have final fitting/alignment completed and welded in place. The bare metal areas are then epoxy primed for protection.

Welding

This week sees welding and panel work continue. We look now at the near side rear and start to fettle and trial fit the new complete rear arch panel. The off side has all the cavities and the reverse of the new panel painted ready for fitting.

Welding

This week sees welding work continue. Our attention moves to the off side. We reprofile the off side front sill end. The wing section we removed is then treated and welded back on. The off side door shut has a section removed and replaced. Next the off side rear wing and inner arch are removed. New panels are trimmed and trial fitted. Before these panels are welded in a new off side rear splash panel is fitted to the end of the sill.

Welding

This week sees welding work continue to the sill areas. The new near side floorpan is welded in and a new outrigger also fitted.

Welding

This week sees welding work carried out to the near side sill areas. To get access we first have to cut off the lower section of the front wing. Once completed the section is welded back on and finished. We then move on to remove the near side front floor pan.

Welding

This session of work sees the car return from the blasters. Next we remove the old door skins, carry out repairs to the door frames, paint up the insides of the new door skins and the doors and fit the new skins. We then trial fit the doors to the car.

Ready for blasting

This week sees the strip down of the car continue ready for the blasting process.

Strip down

This week sees the strip down of the car begin as we remove the engine, gearbox etc as we work towards getting the car ready for blasting.

Arrival and assessment

Firstly we carry out an assessment of the vehicle and draw up a work plan and parts list.

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.